О нас Yancheng Lianggong Formwork Co.,Ltd.

Yancheng Lianggong Formwork, established in 2010, is a leading manufacturer primarily involved in the production and sale of formwork & scaffolding. Our company' s main products include hydraulic auto-climbing formwork, cantilever climbing formwork, H20 timber beam formwork system, single-side bracket, protection screen and unloading platform, table formwork, trench box, plastic formwork, steel frame formwork, aluminium frame formwork etc.

Thanks to over 14 years of abundant factory experience, Lianggong has won high praise from customers both domestically and internationally for our exceptional product quality and outstanding after-sales service.

Furthermore, Lianggong has a professional technical department that collaborates with the sales department to ensure our customers' needs are fully satisfied. We provide a one-stop service, offering products that are available off-the-shelf or can be customized according to your preferences.

Moreover, Lianggong has implemented a quality management system that complies with international standards. We also welcome OEM and ODM orders. For more information, please get in touch with us.
🎓
Команда мирового уровня
Выпускники ведущих мировых университетов
🔬
Продвинутые НИОКР
Собственная разработка
🤖
Фокус на инновациях
Множество инновационных технологий
Box Culvert Formwork

Box Culvert Formwork

Model: Box Culvert Formwork
Params: Customization on demand

Skydeck

Skydeck

Model: FWK-SKYDECK
Params: Max Load Capacity(KN):90KN/m²
PANEL WEIGHT:18kg/m2
MAX PANEL SIZE: 1.5m*0.75m

Curved Steel Formwork

Curved Steel Formwork

Model: FWK-CS55
Params: Length(mm): 1800/1400/1200/1100/900/600/450/400
Width(mm): 900/600/500/450/400/350/300/250/200/150
Thickness(mm): 3-5

Steel Column Formwork:
1.Diameter: 600/700/800/900/1000/1500/2000 or request
2.Height: 500/600/900/1000/1200/1500 or request
3.Thickness: 10mm

Hydraulic Tunnel Lining Trolley

Hydraulic Tunnel Lining Trolley

Model: Hydraulic Tunnel Lining Trolley
Params: Specifications: 6 - 12 m
Maximum lining length: L = 12 m (can be adjusted according to the customers) per unit
Maximum passing capacity: (height*width) construction does not affect the car at the same time
Crawling ability: 4%
Walking speed: 8 m / min
Total power: 22.5 KW Traveling motor 7.5 KW*2 = 15 KW Oil pump motor 7.5 KW
Pressure of hydraulic system: Pmax = 16 Mpa
Unilateral modulus removal of formwork: Amin = 150
Left and right adjustment of horizontal cylinder: Bmax = 100 mm
Lifting cylinder: 300 mm
Maximum stroke of the cylinder: lateral cylinder 300 mm
Horizontal cylinder: 250 mm

Pipe Gallery Trolley

Pipe Gallery Trolley

Model: TC-120
Params: None

Steel Prop

Steel Prop

Model: Heavy Duty Steel Prop AEP-30,Heavy Duty Steel Prop AEP-20,Universal Steel Prop 60,Universal Steel Prop 48
Params: AEP-30: Working Load: 30kN, Outer Tube: 76.1×2.6mm, Inner Tube: 63.5×3.9mm, Support Height: 1450mm~4500mm
AEP-20: Working Load: 20kN, Outer Tube: 76.1×2.6mm, Inner Tube: 63.5×2.6/2.9mm, Support Height: 1450mm~5500mm
60/48: Working Load: 15kN, Outer Tube: 60×3mm, Inner Tube: 48×3.5mm, Support Height: 1400mm~5500mm

Ring-Lock Stair Tower

Ring-Lock Stair Tower

Model: Ring-Lock Stair Tower
Params: The cross-section dimension: 1.5X3.0m
Max height: 150m
Max load capacity: 37.5kN

Ring-Lock Scaffolding

Ring-Lock Scaffolding

Model: 48mm System, 60mm System
Params: 48mm System Load-bearing capacity: 100kN
60mm System Load-bearing capacity: 130kN

Shaft Beam Platform

Shaft Beam Platform

Model: Shaft Beam Platform
Params: Adjustable range: 1.45m-5.8m

Single-Side Bracket

Single-Side Bracket

Model: Single-Side Bracket
Params: Max cast height at one time: 7.5m

Protection Screen and Unloading Platform

Protection Screen and Unloading Platform

Model: Protection Screen and Unloading Platform
Params: Allowable vertical load of anchoring system: 30kN
Allowable horizontal load of anchoring system: 60kN
Working platform width: 900mm
Allowable load of working platform: 0.75kN/㎡
Load capacity of unloading platform: 10kN
Nominal pressure: 25MPa
Cylinder stroke: 715mm
Extension speed: 5mm/s
Working thrust: 60kN
Synchronization error of dual cylinders: ≤20mm

120 Steel Frame Formwork

120 Steel Frame Formwork

Model: FWK-SOF 120
Params: PANEL WEIGHT: 51kg/m2
MAX PANEL SIZE:3.3m x 1.35m
PANEL DEPTH:120mm

Early Stripping Slab Formwork(T-form)

Early Stripping Slab Formwork(T-form)

Model: FWK-DHF175
Params: PANEL WEIGHT: 24kg/m2
MAX PANEL SIZE:1.8m x 1.2m
PANEL DEPTH: 192mm
MAX PERMISSIBLE SLAB THICKNESS: 380mm
plywood thickness:12mm

H20 Timber Beam Formwork

H20 Timber Beam Formwork

Model: Flexible slab formwork&Table slab formwork&Timber column formwork&Timber wall formwork
Params: PANEL WEIGHT: 65kg/m2
PANELDEPTH: 338mm
MAX ONE-TIMECASTING HEIGHT: 12m

Cantilever Climbing Formwork

Cantilever Climbing Formwork

Model: FWK-CB 240
Params: Height of Bracket:10-15 meters
Width of Operating:900mm
Protection Height:Protection Height

Plastic formwork

Plastic formwork

Model: FWK-PF 75
Params: PANEL WEIGHT:15Kg/m2
MAXPANEL SIZE:600x1200x75mm
PANEL DEPTH:75mm
ALLOWABLE CONCRETE PRESSURE:50KN/m2

Tunnel Formwork for Housing

Tunnel Formwork for Housing

Model: FWK-TUN 63
Params: WEIGHT: 75kg/m2
NORMAL HEIGHT: 3m
TIME: 3 days/floor

Hydraulic Auto Climbing Formwork

Hydraulic Auto Climbing Formwork

Model: FWK-ACB 120
Params: Diagonal brace type:
Construction load
- Top platform ≤0.75KN/m2
-Other platform ≤1KN/m2
-Electronically conbrolled hydraulic liftieg system
-Cyinder stroke: 300mm;
- Hydraulic pump station flow; n x 2L /min, n ts the number of seats:
-Stretching speed: aeon 30Qmminn
-Rate thrust: 100KN& 120KN
- Double cylinder synchronization enor: ≤20mm

truss type:

Construction lond:
Top platform ≤ 4KNmF
Other platform < 1KNm
-Electronically conbrolled hydraulic liftieg system
-Cyinder stroke: 300mm;
- Hydraulic pump station flow; n x 2L /min, n ts the number of seats:
-Stretching speed: aeon 30Qmminn
-Rate thrust: 100KN& 120KN
-Double cylinder synchronization enor: ≤20mm

Trench Box

Trench Box

Model: FWK-ST100&FWK-AT100&FWK-SMH100&FWK-AMH100
Params: Size can be customized according to customer requirements
MAXIMUM TRENCH DEPTH: 5.6m
PIPE CLEARANCE HEIGHT: 1.3m
TRENCH WIDTH:1.20-4.60m

Aluminum Frame Formwork

Aluminum Frame Formwork

Model: FWK-FAF 117
Params: PANELWEIGHT: 25kg/m2
MAX PANEL SIZE: 3mx 1m
PANEL THICKNESS: 117mm
MAX ONE-TIME CASTING HEIGHT:6m
MAXIMUM PERMISSIBLE LATERALPRESSURE:60kN/m2

65 Steel Frame Formwork

65 Steel Frame Formwork

Model: FWK-SNF 65
Params: PANEL WEIGHT: 39kg/m2
MAX PANEL SIZE:3m x 1.2m
PANEL DEPTH:63.5mm
MAX ONE-TIME CASTING HEIGHT:12m
MAXIMUM PERMISSIBLE LATER ALPRESSURE:60 kN/m2

Галерея компании

Сертификаты и награды

LG-100 Trench Box EU ECM Technical Documentation Compliance Certification Certificate
LG-100 Trench Box EU ECM Technical Documentation Compliance Certification Certificate
Welding Quality Management System Certificate of Conformity
Welding Quality Management System Certificate of Conformity
Certificate of Conformity of the Factory Production Control
Certificate of Conformity of the Factory Production Control
QUALITY MANAGEMENT SYSTEM CERTIFICATION
QUALITY MANAGEMENT SYSTEM CERTIFICATION
Environmental Management System Certification
Environmental Management System Certification
Occupational Health & Safety Management System Certification
Occupational Health & Safety Management System Certification

Истории успеха

EPC contractor

EPC contractor

The Kalimantan Dam Project is a key infrastructure development aimed at supporting regional water management and energy supply. The structure involves large-volume concrete casting, complex wall geometries, and high structural stability requirements, making it particularly demanding for formwork systems in terms of strength, adaptability, and durability.

To meet these challenges, the contractor selected Lianggong’s H20 Timber Beam Formwork System for the main wall and structural concrete works. The system demonstrated strong adaptability on site, especially in handling irregular and curved sections of the dam structure. Its flexible configuration allowed for efficient adjustments without complicated redesign, ensuring continuous workflow even under changing construction conditions.

Throughout the construction process, the timber beams and panels could be freely cut and reused, significantly improving material utilization. At the same time, the system maintained excellent load-bearing performance during large-scale concrete pouring, ensuring both safety and structural accuracy. The relatively lightweight components also made handling and installation more efficient, helping the project team accelerate the construction schedule.

In addition, the system delivered a high-quality concrete surface finish, reducing the need for extensive post-processing work. This not only improved overall construction efficiency but also contributed to better cost control across the project.

The successful application of the H20 Timber Beam Formwork System in the Kalimantan Dam Project highlights its reliability and versatility in large-scale infrastructure works, especially in projects requiring both structural strength and on-site flexibility.
The concrete pouring achieves not only qualified strength but also a smooth and level finish, eliminating the need for additional grinding work, which significantly improves overall construction efficiency.

📍 Местоположение: ID 📦 Quantity: 100 sets
Municipal engineering company

Municipal engineering company

Construction period is shortened by 20%, which not only saves a large amount of reinforced concrete materials, but also achieves zero safety accidents, and construction efficiency is improved by 4 times.
The panels are made of Q355B steel with extremely high strength, capable of withstanding huge lateral earth pressure.Quick to assemble and disassemble, easy to operate and master.Support installation can follow excavation progress, with shoring applied as digging proceeds, greatly shortening the construction period.Flexible in size with adjustable width, and panels can be customized.Customization service is available, providing exclusive design solutions and technical guidance.

📍 Местоположение: MY 📦 Quantity: 10 sets
Construction company

Construction company

Prefect
Durable and sturdy

📍 Местоположение: RU 📦 Quantity: 25 sets
Construction company

Construction company

Israel is characterized by sandy and loose soil in many areas. The Trench Box effectively mitigates the risk of trench collapse, while eliminating the need for extensive slope cutting in urban construction sites with limited space and dense underground utilities, thereby significantly reducing the volume of earth excavation
Ge adaptability:In certain areas of Israel , the soil is sandy and lacks self-standing capacity. Traditional open-cut with slope cutting is prone to collapse, making the trench box a highly efficient and safe solution.
Efficiency Advantages:Featuring a modular design, the trench box enables rapid assembly and lowering. Compared to steel sheet pile shoring, it offers faster construction speed and lower costs, along with zero vibration and low noise. It is ideally suited for urban construction environments.
Compliance Requirements:Israel’s construction safety codes mandate shoring support for deep trench operations. The trench box is a standard protective equipment that fully complies with local standards.

📍 Местоположение: IL 📦 Quantity: 3 sets
construction company

construction company

In a major healthcare infrastructure project in Trinidad and Tobago, LIANGGONG Hydraulic Auto-Climbing Formwork System (ACS) was successfully applied to the construction of the hospital’s reinforced concrete core structures and vertical shear walls. The project required high standards of safety, precision, and construction efficiency due to its complex structural design and tight schedule.

The hydraulic auto-climbing formwork system, powered by its integrated hydraulic lifting mechanism, enabled the entire formwork assembly to climb steadily without reliance on tower cranes or external lifting equipment. This significantly reduced crane usage on site while ensuring continuous and uninterrupted vertical construction. The system’s ability to allow synchronized or independent climbing of brackets and rails ensured smooth and stable operation throughout the project, even under challenging site conditions.

During construction, the system remained wall-attached and did not require dismantling or reinstallation at ground level, which optimized site space and minimized material damage. The integrated multi-level working platforms provided safe and efficient access for workers, eliminating the need for additional scaffolding and greatly improving overall site safety management.

The project team benefited from the high climbing efficiency of the ACS system, completing each structural level within a shortened cycle time and accelerating the overall construction schedule. At the same time, the system’s high construction accuracy allowed for easy alignment adjustment, ensuring that structural deviations were corrected floor by floor, meeting strict engineering tolerances required for hospital construction.

With its self-climbing capability, reduced labor intensity, and enhanced safety performance, the LIANGGONG Hydraulic Auto-Climbing Formwork System proved to be an ideal solution for this hospital project. The successful implementation not only ensured timely project delive
Easy assembly

📍 Местоположение: TT 📦 Quantity: 70 units

Видео о компании и продукции

Презентация компании и экскурсия по заводу

⏱ Duration: 3:45 | 👁 Views: 15,230

Демонстрация продукта - Kestrel K-1

⏱ Duration: 5:12 | 👁 Views: 28,450

Демонстрация технологических инноваций

⏱ Duration: 4:30 | 👁 Views: 12,890

Отзывы клиентов и истории успеха

⏱ Duration: 6:20 | 👁 Views: 9,650

Готовы изменить свою жизнь?

Свяжитесь с нами сейчас, чтобы узнать, как наша продукция может удовлетворить ваши потребности.