🌍 xinkelcs Mining Container С 2019 ⭐ 7+ Год Отраслевой опыт ✓ Проверенный поставщик Elite
✓ Проверенный поставщик Elite
меню
Corporate presentation references · September 10, 2026

Project Cases

Project references across Uzbekistan, Ethiopia, the United States and Norway for ASIC and blockchain computing infrastructure, including modular and high-density liquid-cooled container deployments from 1.7 MW to 36 MW. Capacity and performance details are included only where disclosed in the September 10, 2026 corporate presentation.

5+Проверенные кейсы
4Страны и регионы
5Отрасли применения
Not disclosedСвоевременная доставка

Истории успеха клиентов

Фильтруйте по отрасли, рынку или типу продукта, чтобы найти сопоставимую реализацию.

5 кейсов показано
ET
High-density liquid-cooled container infrastructure for blockchain computing in Ethiopia.Продукт

Blockchain computing infrastructure buyer (BITMAIN, Ethiopia)

Listed in the September 10, 2026 corporate presentation as a BITMAIN 21.12 MW high-density liquid-cooled container project in Ethiopia, with a project photograph. Operating duration and measured efficiency results are not disclosed.

21.12 MW high-density liquid-cooled container projectQuantity
2 yearsDuration
US
Modular container infrastructure for blockchain computing in Ohio, USA.Продукт

Modular blockchain computing project buyer (BITMAIN, Ohio, USA)

The September 10, 2026 corporate presentation lists a BITMAIN 1.7 MW modular container project in Ohio and includes a project photograph. Operating duration and measured performance results are not disclosed.

1.7 MW modular container projectQuantity
2 yearsDuration
NO
Containerized liquid-cooling infrastructure for blockchain computing in Norway.Продукт

ASIC computing equipment company (Canaan, Norway)

Featured in the company's September 10, 2026 corporate presentation as a 30 MW liquid-cooled container project in Norway for Canaan. The presentation includes a project photograph. Operating duration and measured efficiency data are not disclosed.

30 MW liquid-cooled container projectQuantity
3 yearsDuration
US
Containerized liquid-cooling infrastructure for high-density blockchain computing equipmentПродукт

ASIC computing equipment company (MicroBT, Texas, USA)

The September 10, 2026 company presentation lists a MicroBT 36 MW liquid-cooled container project in Texas, USA, with a project photograph. It demonstrates liquid-cooling integration and overseas delivery experience. Operating duration, measured PUE, water savings and energy savings are not disclosed.

36 MW liquid-cooled container project, as disclosed in the company presentationQuantity
3 yearsDuration
Нет подходящих кейсов. Попробуйте изменить фильтры.

Есть похожий проект?

Поделитесь условиями вашей площадки, необходимыми размерами и применением. Наша инженерная команда порекомендует подходящее решение.

Проектный кейс